If you want to run and deliver reports on a daily basis, select “Daily/Interval”.
Batch Name |
Specify name for the Schedule |
Description |
Description for the schedule. |
Schedule Pattern |
Choose time intervals at which the schedule is to be run, in this case ‘Daily/Interval’. |
Schedule Frequency |
|
Every ____ Day |
Specify number of day’s interval between each time the schedule is run. |
Start Date |
Start date for scheduled task. |
End Date |
End date for the schedule if required, else “No end date”. |
Schedule Time |
|
Occurs at |
Specify what time the schedule is to be run. |
Occurs every |
Specify at what hour intervals the schedule (for example, every 8 hours) is to be run with the option to stipulate the time range during which it is to be run. |
<< Assign Schedule Name and Define schedule frequency | Weekly Report Delivery >>